Butner Primary School, U.S. Army Fort Bragg, North Carolina

Profile:Built in 1959, Butner required a complete renovation; it was reconfigured from an elementary to primary school in 2012. It serves a diverse student population with families in the military and includes courses for SPED, gifted, and STEAM: Science, Technology, Engineering, Arts and Math-from Pre-K through second grade. The new two-story school is designed in neighborhoods, with classrooms and studios; the computing center; art and music rooms; a theater; instructional labs and learning hubs; health, counseling and administration offices; the dining commons and kitchen; and a gym.

 

Services: DataCom Design Group provided Information Technology infrastructure and Audiovisual design and consulting

 

Type: Renovation, New Construction    Size: 96,000 SF